ConstructionBear
App walkthrough · preview
Scroll walkthrough

This is the app.
Scroll through it.

One RFI from field question to signed change order, then an estimate from a drawing to a client signature. Everything below is the real interface.

Scroll
The daily run

Say it like you'd say it on site.

No forms, no templates. You talk, Bear builds the document.

The daily run

Bear presumes. It asks you once.

Project, numbering, spec section, routing. Filled from what Bear already knows. One question, one tap.

The daily run

A finished RFI on your letterhead.

Numbered in your sequence, formatted like you wrote it yourself.

The daily run

Nothing sends without you.

Bear drafts the email. You press Send.

The daily run

Bear keeps score.

Three documents stalled this week. Bear noticed before you had to.

The daily run

Sign it right there.

Draw it once. Bear places it, flattens it into the PDF, and files the status change.

The daily run

Every project, current.

Contract, billed, what's missing. Compiled from your documents, without asking anyone.

Bear
Looking up the projectPulling your company details
COLE CONSTRUCTION GROUP1180 Flushing Ave, Brooklyn NY · (718) 555-0114
REQUEST FOR INFORMATION
RFI NO.123MAIN-RFI-0007
DATEJuly 15, 2026
PROJECT123 Main St, Building A
TOT. Okafor, PE · MEP Engineer
SUBJECT
Water heater type substitution, unit closets
QUESTION
Contract documents call for tankless water heaters in the unit closets (Spec 22 33 00). Contractor requests confirmation that tank-type water heaters may be substituted in these locations. Closet dimensions appear adequate for 40 gal tank units; venting and clearances to be confirmed. Please advise whether the substitution is acceptable and note any impact to cost or schedule.
RESPONSE
SUBMITTED BY · DAN COLE
DATE
Drafting your RFI
Review & sendSending as dan@coleconstruction.com
t.okafor@meridianmep.com
RFI 123MAIN-RFI-0007, Water heater substitution
T., attached for the water heater substitution at the unit closets at 123 Main St. Response requested by July 22. Dan
📄
123MAIN-RFI-0007RFI · sent as a secure link
Discard
Send
I'll route the email and response tracking to them.
Who should answer this RFI?
Skip
1
Nadia Reyes, architect of record
2
T. Okafor, MEP engineer
Create a document
Bear is AI and can make mistakes. Please double-check responses.

Documents

RFIOpen
123MAIN-RFI-0007123 Main St · Jul 15, 2026
CHANGE ORDERSent
123MAIN-CO-0002123 Main St · Jul 6, 2026
SUBMITTALSent
123MAIN-SUB-0003123 Main St · Jul 3, 2026
PAY APPSubmitted
RIVERSID-PAY-0004Riverside Medical Center · Jul 7, 2026
123MAIN-CO-0002SentSigned
Cancel
Done
Drag to move, corner to resize, top dot to rotate. Tap Done to save.
COLE CONSTRUCTION GROUP1180 Flushing Ave, Brooklyn NY
CHANGE ORDER
CO NO.123MAIN-CO-0002
DATEJuly 6, 2026
PROJECT123 Main St, Building A
CONTRACT001, Meridian Properties
DESCRIPTION OF CHANGE
Furnish and install two additional floor drains at the mechanical room, per the response to RFI 123MAIN-RFI-0005. Includes saw cutting, piping to the existing waste line, and patch back.
Original Contract Sum$1,240,000.00
Change by this Change Order$8,450.00
New Contract Sum$1,248,450.00
OWNER · MERIDIAN PROPERTIES, K. VANN
CONTRACTOR · COLE CONSTRUCTION GROUP
Fields
Sign
Markup
Attach

Create signature

Draw
Type
Sign aboveClear
Visual signature only. This is not a legal electronic signature and does not certify legal validity.
Save signature

Projects

MOST ACTIVE
123 Main StActive
Meridian Properties
23Total docs
4This week
2hLast active
7 RFIs3 COs4 Pay Apps5 Submittals
Riverside Medical CenterActive
Dan Cole · Cole Construction Group
41Total docs
2This week
1dLast active
ALL PROJECTS
Henderson ResidenceM. Henderson · 6 docs · $84K contract +2 this week
Active
Lakeview Retail TIBram Retail Group · 12 docs · $410K contract · 71% complete
Active
5th & Pine Mixed UseCorvid Development · 18 docs · $2.1M contract · 12% complete
Active
Marcy Ave BrownstonePrivate client · 9 docs · closed out May 2026
Complete
123MAINeditdelete

123 Main St

Meridian Properties · Brooklyn, NY · construction phase

Contract$1.24M
Invoiced$769K62% of contract
Progress58%inferred from billing
Days to finish94
Documents23
Missing2
DOCUMENTS NEEDED
CLOSEOUTAs-built drawings, HVAC
CLOSEOUTWarranty letter, roofing
Compiled from your notes. Ask Bear in chat to create any of these.
Part two

A drawing becomes a signed number.

Estimating runs the same way. Drop the plan in, Bear prices it with your own history, and the client signs from their inbox.

Estimating

Drop in the drawing.

A plan, a photo, a PDF. Bear reads it like a person would.

Estimating

Bear remembers your numbers.

The unit price you used in April is the price it carries now. You never enter it twice.

Estimating

Scope to proposal in one pass.

Line items, totals, terms. Formatted and ready for a signature.

Estimating

Off to the client, with your approval.

Same rule as always. Nothing leaves without your Send.

Estimating

Your client signs from the email.

No login, no app to install. Open, sign, done.

Estimating

Sent becomes Signed.

The status flips the second they sign. You'll know before they call you.

Bear
GARAGE20'-0" × 20'-0" CL. 20'-0"
PDF
Reading the filesChecking your past rates
COLE CONSTRUCTION GROUP1180 Flushing Ave, Brooklyn NY
BID PROPOSAL
PROPOSAL NO.HENDERSO-BID-0001
DATEJuly 15, 2026
PROJECTHenderson Residence, Garage Conversion
VALID THROUGHAugust 14, 2026
BID BREAKDOWN
DescriptionQtyUnitUnit PriceTotal
Demolition and prep1LS6,400.006,400.00
Framing, insulation, drywall400SF47.2518,900.00
Electrical, subpanel + 6 circuits1LS7,200.007,200.00
Ductless mini split, 12k BTU1EA5,450.005,450.00
Water heater swap, tankless to tank2EA1,850.003,700.00
Paint and trim1LS4,100.004,100.00
Subtotal$45,750.00
Contingency$1,500.00
Tax$1,500.00
Total Base Bid$48,750.00
Drafting your Bid Proposal
Review & sendSending as dan@coleconstruction.com
m.henderson@gmail.com
Proposal, Garage conversion, Henderson Residence
Mr. Henderson, proposal for the garage conversion attached, valid through August 14. Happy to walk through it any time. Dan
📄
HENDERSO-BID-0001Bid Proposal · sent as a secure link
Discard
Send
Drop files to attach
Create a document
Bear is AI and can make mistakes. Please double-check responses.
Inbox

Proposal, Garage conversion, Henderson Residence

DC
Dan ColeCole Construction Group
4:52 PM

Mr. Henderson,

Proposal for the garage conversion attached, valid through August 14. Happy to walk through it any time.

📄
HENDERSO-BID-0001Bid Proposal · shared by Cole Construction Group
View document

Dan

Sent with ConstructionBear
ConstructionBear
BID PROPOSALHENDERSO-BID-0001
Download
Edit
Cancel
Done
Drag to move, corner to resize. Tap Done to save.
SCOPE OF WORK
Convert the existing 400 sf attached garage to a conditioned rec room. Slab on grade remains. New partition framing, insulation, drywall and paint. Electrical subpanel and six circuits. One ductless mini split. Replace two tankless water heaters with 40 gal tank units at the closet bank.
BID BREAKDOWN
DescriptionQtyUnit PriceTotal
Demolition and prep16,400.006,400.00
Framing, insulation, drywall40047.2518,900.00
Electrical, subpanel + 6 circuits17,200.007,200.00
Ductless mini split, 12k BTU15,450.005,450.00
Water heater swap, tankless to tank21,850.003,700.00
Paint and trim14,100.004,100.00
Subtotal$45,750.00
Contingency$1,500.00
Tax$1,500.00
Total Base Bid$48,750.00
ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are accepted. You are authorized to do the work as specified.
ACCEPTED BY (OWNER)
DATE OF ACCEPTANCE
Made with ConstructionBear · Create docs like this free · Report
Fields
Sign
Markup
Send documents like this yourself.

Create a free ConstructionBear account. Your first two documents are on us.

Create free account

Documents

BID PROPOSALSentSigned
HENDERSO-BID-0001Henderson Residence · Jul 15, 2026
RFIOpen
123MAIN-RFI-0007123 Main St · Jul 15, 2026
CHANGE ORDERSigned
123MAIN-CO-0002123 Main St · Jul 15, 2026
SUBMITTALSent
123MAIN-SUB-0003123 Main St · Jul 3, 2026
Document signedM. Henderson signed HENDERSO-BID-0001
ConstructionBear

Pour is Thursday.
The paperwork takes a minute.

Chat. Generate. Bear remembers.

Start your first document Your first few documents are on us. No card to start.
Back to the site